A chimney repair scope both sides can sign

Ask for a repair scope

A scope, written out

This is the shape of a repair scope we write after a Level 2 on an older La Mirada house. Four findings came back from the camera and the roof. The seller's agent needed to know which to agree to; the buyer's agent needed figures to put in an addendum. Each line names the finding, the work, the price or how the price will be set, and what proof follows.

Nothing is in the scope that is not in the report, and nothing in the report is left out. That makes the two documents easy to lay side by side.

  • Finding 1. Open joint between flue tiles below the top. Tile repair or relining; firm figure once the joint is measured.
  • Finding 2. Uncapped flue. Stainless cap with spark screen fitted, quoted on site, roof photos on completion. Custom and oversized caps are priced to the job.
  • Finding 3. Lifted flashing on the uphill face. Leak tracing and repair, $585 to $3,500, photos of each face.
  • Finding 4. Rusted damper plate that no longer seats. Price set once the plate is out and the frame can be seen.

Scheduling before close

We do not promise a finish date ahead of closing. Roof access, the weather and the supply of a particular cap or liner can each move the plan, and a promise we cannot keep helps no one at the closing table. What we give instead is the shape of the work: which lines take one visit, which need two, which depend on a part being ordered, and in what order they run.

Agents use that to choose between repairs before close and a credit. Where repairs go ahead, we confirm each visit with both agents so lockbox access and roof access are settled before the crew arrives.

Paperwork for each side

The seller, or whoever pays, signs the scope. When the work is finished, both agents receive the same completion set: photos of every line, a short note describing what was done, and, for anything inside the flue, a fresh camera clip of the repaired section. An escrow officer or lender named on the booking receives it too.

If the parties settle on a credit instead, we can reissue the scope addressed to the buyer, so it is ready for the new owner to sign after closing. The findings and prices stay as they were.

Starting point for every scope

A repair scope begins with a camera report. If the house has none yet, this is the visit that produces it.

Flue video and roof check that every scope is built on
$410

Repair prices sit on the scope itself, line by line, never inside the inspection fee.

Agent questions about escrow repairs

Will you price only the items in our request for repair?

Yes. Send the finding numbers you want priced and the scope covers those lines alone. The other findings stay in the report for the record.

Can repairs wait until after closing?

They can. Many deals settle on a credit, and we readdress the same scope to the buyer for after possession. If a finding sits in the top band, we say plainly that the fireplace should not be used until it is fixed.

Can the buyer take our report to another contractor?

Of course. The findings and photos stand on their own, apart from our prices, so any contractor can quote from them.

The seller's own contractor already did the work. Can you confirm it?

A fresh Level 2 at $410 shows the repaired sections on camera and from the roof. The report states what we saw, without comment on who did it.

Who signs if the buyer is paying for the repairs?

The buyer does. The scope names whoever orders the work, and that person receives the completion photos first, with copies to the names they choose.

Turn the findings into a priced page

Use the contact page to send the report date and the finding numbers in play. We return a scope the listing side and the buying side can both read the same way.

Call (562) 449-0418
Call (562) 449-0418